Land Fill Cell Construction
The main cells are created in an excavation from 2mm heavy duty
polyethylene geomembrane. This contains the deadly leachate and prevents
its ingress into the water table.
Temporary Capping
This is performed every few weeks to protect the environment from
gasses from the land fill and also to prevent water getting into
the cell.
Cell Capping
Once the land fill site is full, a single layer of geomembrane is
welded over the top of the cell. This has two purposes, one is to
stop further ingress of water and the other is so that methane gas
produced within the waste can be ducted off and used as fuel for
power generating.
Catalogue Engineering are proud of the speed and efficiency of its
installation teams. This is enhanced by our policy to use only the
latest and best quality Demtech welders and testing equipment.
We can also supply only deals for prefabricated temporary caps for
self install.
We offer a full service including:
- Design and specification
- Excavations
- Supply and install of geomembrane and geotextile
- Finish landscaping.